CONTRACT MANUFACTURING
Contract Beverage Manufacturing and Co-Packing
You already own the product. ACMFOOD provides the capacity. Combined daily output across our partner lines reaches 20,000 cartons, with a production lead time of 15 to 30 days and filling in aluminium cans, PET and glass. The minimum run is 500 cartons per SKU, and your formula and specifications remain your property.

20,000 Cartons / Day
Combined daily capacity across partner production lines.
15–30 Days
Production lead time from confirmed order to shipment readiness.
HACCP · ISO 22000 · FSSC 22000
Certifications held by the facilities running your production.
T/T · HCMC Port
Standard payment terms and departure port for all shipments.
WHEN CONTRACT MANUFACTURING FITS
Capacity Without Capital
Contract manufacturing suits brands with an established product that need production capacity rather than product development.
Scaling Beyond Your Line
Demand has outgrown your own facility and you need additional volume without building capacity.
Entering Asia-Pacific
Producing closer to raw material origin cuts freight cost and lead time for regional distribution.
Adding a New Format
Your line runs PET but the market wants sleek cans. We fill the format you cannot.
Seasonal Peaks
Cover summer or festival demand spikes without leaving capacity idle for the rest of the year.
Second-Source Supply
Many buyers require a qualified backup supplier before listing a product with a large retailer.
Formula Transfer
We reproduce your specification, run trial batches and confirm the match before full production.
FREQUENTLY ASKED QUESTIONS
Contract Manufacturing Questions
What established brands ask when qualifying a co-packer.
Can you reproduce our existing formula exactly?
We work from your specification and run trial batches until the result matches your reference sample on taste, colour, Brix and other agreed parameters. Some ingredients may need a local equivalent, which we identify and confirm with you before production.
How is our formula protected?
An NDA can be signed before technical information is exchanged. Formula documents are shared only with the people who need them to run the batch.
What is the production capacity?
Combined daily output across the partner lines ACMFOOD operates through is around 20,000 cartons per day. Actual throughput depends on format, fill volume and line configuration.
Do you supply the raw materials and packaging?
Yes, this is the usual arrangement. Buyer-supplied materials can also be accommodated where you have an existing ingredient or packaging contract.
Can our quality team audit the facility?
Yes. The facilities ACMFOOD produces in hold HACCP, ISO 22000 and FSSC 22000, and certificates plus supporting documentation can be provided for supplier qualification and audit preparation.
What are the commercial terms?
ACMFOOD invoices on T/T terms. Goods ship from Ho Chi Minh City Port. Incoterms, batch sizes and production scheduling are agreed per contract.
Need additional beverage production capacity?
Send your product specification, target volume and packaging format. We will confirm whether the format is a fit and what scheduling looks like.














